OffererTJC Engineering, Inc.
Contract NumberW912QR-04-D-0015-0040
Original Completion Date12/21/2008
Original Value$4,755,505.00
Type of ContractFirm Fixed Price
RolePrime Contractor
Award Date09/21/2007
Final Completion Date09/09/2010
Final Value$5,024,208.00
LocationFt. Campbell, KY

Project Description

Evaluation Rating: Outstanding

Design/Build project involving the complete design of a force protection barrier wall system along the interface of Fort Campbell Military Installation and US Hwy 41A from Gate 6 to Gate 1.  The approximate total length of the wall is 17,000 LF.  

 Work included:

  • demolition of existing force protection chain link fence
  • tree removal
  • clearing and grubbing
  • excavation
  • reinforced concrete footings
  • reinforced concrete masonry wall units
  • brick façade at piers
  • seed and straw
  • temporary fencing and facilities to maintain security during construction operations